Post Street Bridge Here a 63m and a 58m boom pump are being used simultaneously to place concrete to support the middle of Post Street Bridge. The best way to reach the middle of a big bridge is with big booms! Project Details Here a 63m and a 58m boom pump are being...
Gonzaga Performing Arts Center We placed concrete in 30’ walls, 60’ in the air and did a little flatwork (driveways, interior and exterior floors) at the new Gonzaga Performing Arts Center. The art of concrete enhancing the arts buildings in Spokane. Project Details...
Riverfront Pavilion The Riverfront Pavilion has stood since 1974 when it was part of the International World’s Fair. It was renovated in 2019 with a fresh look. We placed concrete to hold up the new amphitheater and elevated walkway. Pouring concrete for the...