Downtown High-Rise Concrete Placement – Thomas George Tower
Champion pumped the concrete for The Thomas George Tower using various sizes and configurations of boom pumps up to a 63meter Putzmiester, and then reached the top 6 floors with a 32-meter Schwing Placing Boom while running hardline from the street level up the elevator shaft.

